Friday, January 13, 2017

Pardon Our Dust UPDATE

LANE Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. This week, utility relocation is occurring on Main Street. Roadway work is continuing on the north side of westbound Broad Street. Traffic signal testing is continuing throughout the Pulse corridor. Work has begun in the median of Broad Street, in preparation for station construction.
Effective Mon., Jan. 23, permanent closures of the median and inside lanes of Broad Street, from Hamilton Street to 1st Street, is expected. This is resulting from a Work-In-Street-Permit (WISP-010848-2017) allowing LANE to close the Broad St. median from Hamilton St. to 1st St., and allowing for Group 1 and Group 2 stations (all median stations) to be built concurrently, when possible.
This work is occurring during permitted work hours from 7 a.m. to 5 p.m., Monday to Saturday. 
Details are below. All schedules are weather and progress-dependent. Due to the snowstorm over the weekend impacting roads and travel, construction could not occur on Mon., Jan. 9. Crews performed snow clean-up on Tues., Jan. 10. Construction activity resumed on Wed., Jan. 11.
WEEKLY RECAP:   Monday, January 9 to Saturday, January 14
Utility Relocation:  
Where:     Eastbound and westbound Main St., at 15th St. 
Impacts:   Single lane closures moving laterally across Main St.   
Roadway Construction:   
Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St. 
Median Station Construction:
Where: Median of Broad St., from Thompson St. to Foushee St.
Details: Work includes sawcutting inside lanes / median
Impacts: Temporary closures of median / inside lanes. Two travel lanes remain open.
Traffic Signal Work:    
Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                14th Street between Broad St. and Main St.
                Main St. at 14th St. east to Orleans St. 
Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas
NOTE: Work is occurring in both eastbound and westbound directions.
Monday, January 16 to Saturday, January 21

Roadway Construction:   
Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St. 
Median Station Construction:
Where: Median of Broad St., from Thompson St. to Foushee St.
Details: Work includes sawcutting inside lanes / median
Impacts: Temporary closures of median and inside lanes of Broad St. Two travel lanes remain open.
Monday, January 23 to Saturday, January 28

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 
Median Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows:North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).



Monday, January 30 to Saturday, February 4



Median Station Construction:

Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 

Where: Median of Broad St., between Allison St. & Meadow St. 

Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).



Tuesday, January 10, 2017

Pulse Traffic Advisory: Broad St Median & Inside Lane Closure Between N. Hamilton & 1st St

Pulse construction work is expected to progress to the median-running section of the Pulse route beginning Monday, January 23, 2017.

The inside lanes and median of Eastbound and Westbound Broad Street will close between N. Hamilton and 1st Street to facilitate median station construction and new median construction, as permitted by the City of Richmond Department of Public Works Work In Street Permit (WISP-010848-2017).

This closure will permit LANE Construction to build median stations concurrently, when possible, through May 30, 2017. Staging for work in this area will occur within the closure space, limiting area impacts. Two travel lanes in each direction of Broad Street will remain open. The future median Pulse-only dedicated travel lanes will be permanently closed to general vehicular traffic.
On-street parking impacts will occur when individual median stations are constructed, as shown here:  Parking (I-195 to Bowe St); Parking (Ryland St to 14th St). Specific updates will be provided as the station construction progresses. The first median station expected to be built is Allison St Eastbound, and you can review parking changes here.

WHO:              DB Contractor, LANE Construction

WHAT:             Closure of inside lanes on Eastbound and Westbound Broad Street from: N. Hamilton to Boulevard; Boulevard to Hermitage; Hermitage to Belvidere; Belvidere to 1st Street. This closure is necessary to facilitate demolition of the existing median, construction of a new median and construction of median stations.

WHEN:            Beginning Monday, January 23, 2017. Closure hours will be 24 hours a day, 7 days a week
. This work is permitted through May 30, 2017.
WHERE:           Inside lanes on Eastbound and Westbound Broad Street from: N. Hamilton to Boulevard; Boulevard to Hermitage; Hermitage to Belvidere; Belvidere to 1st Street.
BRIEF: It is important to note that field conditions can change rapidly and LANE's goal is to work safely and swiftly to minimize impacts to the areas where they work. The schedule is progress- and weather-dependent. Pedestrian pathway detours and street lane closure signs will be posted accordingly. Please follow construction signage and be aware of construction workers and vehicles within the work zone(s). Pedestrians are advised to follow work zone signage in the sidewalk area. Travelers may notice temporary barriers while this closure is in effect.

BACKGROUND: During construction, the public will continue to have access to businesses, organizations and services located along the Project route.

A construction hotline is active at 804-980-0084, providing updates on construction and expected impacts. For updates online, please visit the Pulse Construction Updates page: http://www.ridegrtc.com/brt/construction-info. As work progresses, frequent updates will be provided.

LANE Construction will proactively minimize disruption to businesses and residents during construction. Any activity that would impact parking, loading zones, access, utilities and other business-related functions must receive approval from VDOT who will ensure that continuous access will be provided to all businesses at all times. All Project team members are committed to providing prompt information to ensure a smooth construction phase for businesses, residents and patrons of the region as part of the overall success of the Project. For the City of Richmond Pulse Business Support Initiative, please visit PulseRVA.com.

As always, work is weather and progress-dependent. Pulse service is expected to begin in October 2017.


GRTC Pulse is a modern, high quality, high capacity rapid transit system that will serve a 7.6-mile route along Broad Street and Main Street, from Rocketts Landing in the City of Richmond to Willow Lawn in Henrico County. The Pulse will link the public to many exciting destinations, businesses, services and restaurants.

Friday, January 6, 2017

Pardon Our Dust UPDATE

LANE Construction continues with work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Currently, utility relocation is continuing on Main Street. Roadway work is continuing on the north side of westbound Broad Street.  Work is also beginning in the median of Broad Street, also in preparation of station construction.  

Permitted work hours are from 7 a.m. to 5 p.m., Monday to Saturday.  Please note that night work (6 p.m. to 6 a.m.) is scheduled on Main Street at 15th Street on Wednesday, January 11 and Thursday, January 12.  

Also, effective, Monday, January 23, LANE will close the Broad Street median from Hamilton Street to 1st Street, as per new Work-In-Street-Permit.  This will allow LANE greater flexibility to build Groups 1 and 2 (all median stations) concurrently, when possible.  Follow us on Twitter @GRTCPulse for updates on work hours. 

All schedules are weather and progress-dependent. 

WEEKLY RE-CAP:   Tuesday, January 4 to Saturday, January 7

Utility Relocation:

  •     Where:   Eastbound and westbound Main St., from 15th St. to 17th St.
  •     Impacts: Temporary closures of sidewalk. Work does not require lane or       parking closures.

Roadway Construction:   

  •     Where:  North side of westbound Broad St., between Allison St. and             Strawberry St.
  •     Impacts: Temporary closures of the westbound curb lane and adjacent         sidewalk, as well as  temporary loss of street parking, from Allison St. to     Strawberry St. 

Median Station Construction:

  •     Where:  Median of Broad St., from Thompson St. to Foushee St.
  •     Details:  Work includes sawcutting in median
  •     Impacts:  Temporary closures of median and inside lanes of Broad St., in     both the eastbound and westbound directions, between Thompson St.         and Foushee St.  

Traffic Signal Work:  

  •     Where:   Broad St. at Willow Lawn Dr. east to 14th St.

                           14th Street between Broad St. and Main St.

                           Main St. at 14th St. east to Orleans St.

  •     Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus           stops in affected areas

NOTE: Work is occurring in both eastbound and westbound directions.

Monday, January 9 to Saturday, January 14


Utility Relocation:

  •     Where:   Eastbound and westbound Main St., at 15th St. 
  •     When:    This is night work (6 p.m. to 6 a.m.) occurring on Wed., Jan.            11 and Thurs., Jan. 12.
  •     Impacts:   Double lane closures moving laterally across Main St. One     travel lane will remain open in the eastbound and westbound directions.  

Roadway Construction:   

  •     Where:   North side of westbound Broad St., between Allison St. and           Strawberry St.
  •     Impacts:  Temporary closures of the westbound curb lane and                     adjacent sidewalk, as well  as temporary loss of street parking, from            Allison St. to Strawberry St. 

Traffic Signal Work:  

  •    Where:   Broad St. at Willow Lawn Dr. east to 14th St.

                         14th Street between Broad St. and Main St.

                         Main St. at 14th St. east to Orleans St.

  •     Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus           stops in affected areas

NOTE: Work is occurring in both eastbound and westbound directions.

Monday, January 16 to Saturday, January 21


Station Construction: Allison East 

  •     Where:    Median of Broad St., between Allison St. & Meadow St. 
  •     Impacts:   Permanent closures of median and inside lanes of Broad St.,       in both the eastbound and westbound directions, at Allison East. Street       parking impacts are as follows:  North side of Broad St (WB direction)         between Strawberry St. and Allen Ave.: parking will be permanently             removed.   South side of Broad St. (EB direction) between Strawberry St.     and Allen Ave.:  parking will remain where it currently exists, except for      two parking spaces and one loading zone in front of the Bookbindery             Building’s parking deck (east of the parking deck’s entrance).


Monday, January 23 to Saturday, January 28

Media Station Construction: 
  • Where: Median of Broad St., from Hamilton St. to 1st St.
  • Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, between Hamilton St. and 1st St.
  • Details: Work includes saw cutting in median.
NOTE: This should allow LANE greater flexibility to build median stations in Groups 1 and 2 concurrently, when possible.

Station Construction: Allison East 
  • Where: Median of Broad St., between Allison St. & Meadow St. 
  • Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows:    North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.   South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).


Thursday, December 22, 2016

Pardon Our Dust UPDATE- Holiday Edition

LANE Construction continues with work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Currently, utility relocation is continuing in locations along Broad Street and Main Street. Roadway work, in preparation for station construction, is continuing on westbound Broad Street.  Permitted work hours are from 7 a.m. to 5 p.m., Monday to Saturday.  Please note that night work (6 p.m. to 6 a.m) is scheduled on Main Street at 15th Street on Wednesday, January 4 and Thursday, January 5.   Follow us on Twitter @GRTCPulse for updates on work hours. 

All schedules are weather and progress-dependent. 

NOTE:  In observance of the Christmas and New Year’s holidays, LANE follows holiday restrictions and marks non-work days as:  Mon., Dec. 26, Fri., Dec. 30; Sat., Dec. 31; and Mon., Jan. 2.

WEEKY RE-CAP:   Monday, December 19 to Saturday, December 24

Utility Relocation:  

  • Where:     Eastbound and westbound Main St., from 15th St. to 17th St.
  • Impacts:   Temporary closures of sidewalk. Work does not require lane or parking closures.
  • Where: South side of eastbound Broad St., from Hermitage Rd. to Boulevard
  • Impacts: Temporary closures of sidewalk. Work does not require lane or parking closures.

Roadway Construction: 

  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well  as temporary loss of street parking, from Allison St. to Strawberry St.

Tuesday, December 27 to Thursday, December 29

Work Zone Maintenance: 

  • Where:   Eastbound and westbound Main St., from 15th St. to 17th St.

                     Eastbound Broad St., from Boulevard to Hermitage Rd.

                    Westbound Broad St., between Allison St. and Strawberry St.

  • Impacts: None. Crews will be checking barrels and ensuring maintenance in existing work areas.

Tuesday, January 3 to Saturday, January 7
NOTE:  In observance of the Christmas and New Year’s holidays, LANE follows holiday restrictions and marks non-work days as:  Mon., Dec. 26, Fri., Dec. 30; Sat., Dec. 31; and Mon., Jan. 2.



Utility Relocation:  

  • Where: Eastbound and westbound Main St., at 15th St. 
  • Impacts: Temporary closures of curb lane, sidewalk, street parking in work zone.

  • Where:     Eastbound and westbound Main St., at 15th St. 
  • When: This is night work (6 p.m. to 6 a.m.) occurring on Wed., Jan. 4 and Thurs., Jan. 5.
  • Impacts:   Double lane closures moving laterally across Main St. One travel lane will remain open in the eastbound and westbound directions.  

Roadway Construction:   

  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well  as temporary loss of street parking, from Allison St. to Strawberry St. 

Median Station Construction:

  • Where: Median of Broad St., from Thompson St. to Foushee St.
  • Details: Work includes sawcutting in median – likely starting with Allison East 
  • Impacts: Temporary closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, between Thompson St. and Foushee St.  

Traffic Signal Work:    

  • Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                     14th Street between Broad St. and Main St.
           
                     Main St. at 14th St. east to Orleans St. 

  • Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas.

NOTE:   Work is occurring in both eastbound and westbound directions.

Monday, January 9 to Saturday, January 14


Traffic Signal Work:    

  • Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                     14th Street between Broad St. and Main St.

                     Main St. at 14th St. east to Orleans St. 

NOTE:    Work is occurring in both eastbound and westbound directions.
Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas.

Station Construction: Allison East

  • Where: Median of Broad St., between Allison St. & Meadow St. 
  • Details: Demolition and excavation work at Allison East 
  • Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows:
North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.

South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).



Friday, December 16, 2016

Pardon Our Dust UPDATE

LANE Construction continues with work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Currently, utility relocation is continuing in locations along Broad Street and Main Street. Roadway work, in preparation for station construction, is continuing on westbound Broad Street.  Permitted work hours are from 7 a.m. to 5 p.m., Monday to Saturday.  Please note that night work can occur as permitted if unforeseen field conditions arise or as needed to minimize area impacts.  Follow us on Twitter @GRTCPulse for updates on work hours. 

All schedules are weather and progress-dependent. 

WEEKLY RE-CAP:   Monday, December 12 to Saturday, December 17

Utility Relocation:
Where:    South side of eastbound Main St., from 15th St. to 17th St.
Impacts:  Temporary closures of curb lane and sidewalk. One travel lane will remain open.

Night work (6 p.m. to 6 a.m.) performed Wed., Dec. 14:
Where: Broad St. eastbound at Meadow St./Hermitage Rd., and Boulevard
When: Work should begin around 7 p.m. in these locations.
Impacts: Inside eastbound lane is closed; two eastbound travel lanes remain open.

Where: Broad St. eastbound at Laurel St.
When: Work should begin around 10 p.m. in this location.
Impacts: Two inside lanes closed; one eastbound travel lane will remain open.

Roadway Construction:
Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St.

Traffic Signal Work:  
Where:   Broad St. at Willow Lawn Dr. east to 14th St.
               14th Street between Broad St. and Main St.
                Main St. at 14th St. east to Orleans St.
Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas

NOTE: Work is occurring in both eastbound and westbound directions.

Monday, December 19 to Saturday, December 24



Utility Relocation:
Where:    South side of eastbound Main St., from 15th St. to 17th St.
Impacts:  Temporary closures of curb lane and sidewalk. One travel lane will remain open.

Roadway Construction:
Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St.

Traffic Signal Work:    
Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                14th Street between Broad St. and Main St.
                Main St. at 14th St. east to Orleans St.
Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas

NOTE: Work is occurring in both eastbound and westbound directions.

Tuesday, December 27 to Thursday, December 29
NOTE:  In observance of the Christmas and New Year’s holidays, LANE follows holiday restrictions and marks non-work days as:  Mon., Dec. 26, Fri., Dec. 30; Sat., Dec. 31; and Mon., Jan. 2.


MOT Sign Installation:
Where:   Eastbound and westbound Broad St., from Thompson St. to Foushee St.
Impacts:  Temporary closures of curb lanes and parking, between Thompson St. and Foushee St., in both the eastbound and westbound directions.

Friday, December 9, 2016

Pardon Our Dust UPDATE

LANE Construction continues with work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Currently, utility relocation is continuing in locations along Broad Street and Main Street. Roadway work, in preparation for station construction, is continuing on westbound Broad Street.  Permitted work hours are from 7 a.m. to 5 p.m., Monday to Saturday.  Please note that night work can occur as permitted if unforeseen field conditions arise or as needed to minimize area impacts.  Follow us on Twitter @GRTCPulse for updates on work hours. 

All schedules are weather and progress-dependent.  

WEEKLY RECAP:   Monday, December 5 to Saturday, December 10

Utility Relocation:    
  • Where:   Median of Broad St., at Hermitage Rd.
  • When:    This is night work (6 p.m. to 6 a.m.) occurring on Tues., Dec. 6, and Wed., Dec. 7. This work also occurred during the day (7 a.m. to 5 p.m.) on Wed., Dec. 7.  
  • Impacts: One inside lane is closed, in both eastbound and westbound directions. Two travel lanes remain open in both directions. On-street parking is closed in this work zone.
Roadway Construction:   
  • Where:  North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts:Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St. 

Monday, December 12 to Saturday, December 17




Utility Relocation:  
  • Where:   South side of eastbound Main St., from 15th St. to 17th St.
  • Impacts: Temporary closures of curb lane and sidewalk. One travel lane will remain open.  
Roadway Construction:   
  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St. 
MOT Sign Installation:   
  • Where:    Eastbound and westbound Broad St., from Thompson St. to Foushee St.
  • Impacts:  Temporary closures of curb lanes and parking, between Thompson St. and Foushee St., in both the eastbound and westbound directions. 
Traffic Signal Work: 
NOTE: Work is occurring in both eastbound and westbound directions.   
  • Where:    Broad St. at Willow Lawn Dr. east to 14th St.
                      14th Street between Broad St. and Main St.

                      Main St. at 14th St. east to Orleans St. 
  • Impacts:Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas

Monday, December 19 to Saturday, December 24
NOTE:  LANE expects median station construction to begin this week. This includes saw-cutting the median, from Thompson St. to Foushee St., and station foundation work, beginning at Allison East.



Roadway Construction:   
  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St. 

Traffic Signal Work:
NOTE: Work is occurring in both eastbound and westbound directions.   
  • Where:    Broad St. at Willow Lawn Dr. east to 14th St.
                      14th Street between Broad St. and Main St.

                      Main St. at 14th St. east to Orleans St. 
  • Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas


Friday, December 2, 2016

Pardon Our Dust UPDATE

LANE Construction continues with work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Currently, utility relocation is continuing in locations along Broad Street and Main Street. Preliminary station construction also has begun on westbound Broad Street. MOT signs, which will direct the traveling public through work zones on Broad Street, are being installed.  Permitted work hours are from 7 a.m. to 5 p.m., Monday to Saturday.

Please Note: Night work (6 p.m. to 6 a.m.) is expected on Thursday, December 8, and Friday, December 9, in three locations along eastbound Broad Street.

All schedules are weather and progress-dependent. 
  
WEEKLY RECAP: Monday, November to Saturday, December
Utility Relocation:    
  • Where:   North and south sides of Main St., from 15th St. to 17th St.
  • Impacts:   Temporary curb lane closures in both the westbound and eastbound directions.  One travel lane will remain open in each direction. 
Roadway Construction:   
  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well  as       temporary loss of street parking, from Allison St. to Strawberry St. 
Installation of MOT Signs:   
  • Where:   Eastbound and westbound Broad Street, from Thompson St. to Foushee St.
  • Impacts:   Temporary closures of curb lanes and parking, between Thompson St. and Foushee St., in both the eastbound and westbound directions. 
Monday, December 5 to Saturday, December 10


Utility Relocation:   
Broad Street:   Night work (6 p.m. to 6 a.m.) is scheduled for Tues., Dec. 6, and Wed., Dec. 7, in the following locations: 
  • Broad St. eastbound, at Laurel St.
  • Broad St. eastbound, at Hermitage Rd. 
  • Broad St. eastbound, at Boulevard
Impacts include double lane closures in the above locations along eastbound Broad St. One travel lane will remain open.  

Main Street:
  • Where:    North and south sides of Main St., from 15th St. to 17th St.
  • Impacts:  Temporary curb lane closures in both the westbound and eastbound directions. One travel lane will remain open in each direction. 
Roadway Construction:   
  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well  as temporary loss of street parking, from Allison St. to Strawberry St. 
Installation of MOT Signs:   
  • Where:   Eastbound and westbound Broad Street, from Thompson St. to Foushee St.
  • Impacts:   Temporary closures of curb lanes and parking, between Thompson St. and Foushee St., in both the eastbound and westbound directions. 
Traffic Signal Work:    
  • Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                     14th Street between Broad St. and Main St.

                      Main St. at 14th St. east to Orleans St. 
  • Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas
NOTE: Work is occurring in both eastbound and westbound directions.

Monday, December 12 to Saturday, December 17


Roadway Construction:   
  • Where:   North side of westbound Broad St., between Allison St. and Strawberry St.
  • Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well  as temporary loss of street parking, from Allison St. to Strawberry St. 
Installation of MOT Signs:   
  • Where:   Eastbound and westbound Broad Street, from Thompson St. to Foushee St.
  • Impacts:   Temporary closures of curb lanes and parking, between Thompson St. and Foushee St., in both the eastbound and westbound directions. 
Station Construction: Allison East 
  • Where: Median of Broad St., between Allison St. & Meadow St. 
  • Details: Foundation construction at Allison East.
  • Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East.  If there are parking impacts as a result of this permanent closure of the median, public notification will be made as soon as possible in advance. 
Traffic Signal Work:    
  • Where:   Broad St. at Willow Lawn Dr. east to 14th St.
                     14th Street between Broad St. and Main St.

                     Main St. at 14th St. east to Orleans St. 
  • Impacts:  Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas
NOTE: Work is occurring in both eastbound and westbound directions.