Pardon Our Dust UPDATE

LANE Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

Work is occurring on Broad Street, with permanent closures of the median and inside lanes, from Hamilton Street to 1st Street. Maintenance of Traffic (MOT) has been established; see last page of this look-ahead for approved messaging on the MOT, which can be shared with stakeholders.

This week, station construction continued at Allison East, a median station on Broad Street. Traffic signal work is continuing along Broad St. at intersections between the Boulevard and Lombardy Street.

Most of the station construction is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Night work occurred this week for Allison East station construction on Tues., Feb. 21, and Wed., Feb. 22, from 6 p.m. to 6 a.m. The traffic signal work is occurring during both permitted daytime and nighttime hours.

All schedules are weather and progress-dependent.

WEEKLY Re-Cap:   Sunday, February 19 to Saturday, February 25

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 19 to Thurs., Feb. 23
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 20 to Fri., Feb. 24
Where:   Broad St. between Boulevard and Ryland St.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.

Station Construction: Allison East 
When: Night work (6 p.m. to 6 a.m.) Tues., Feb. 21 and Wed., Feb. 22
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 20 to Fri., Feb. 24
Where: Median of Broad St., between Allison St. & Meadow St.
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking has been permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. Parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Sunday, February 26 to Saturday, March 4

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 26 to Thurs., March 2 
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 27 to Fri., March 3
Where:   Broad St. between Allison St. and Lombardy St.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Roadway Work:
Details: Demolition of median curb from Science Museum to Hamilton St.
Impacts: No additional traffic impacts; work is within existing work zone.

Waterline Relocation:    Allison West
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Sunday, March 5 to Saturday, March 11

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., March 5 to Thurs., March 9 
                        Day work (7 a.m. to 5 p.m.) Mon., March 6 to Fri., March 10
Where:   Broad St. at Lombardy St. westward.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Waterline Relocation:    Allison West
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Station Construction: Science Museum West 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Science Museum West. Street parking impacts are as follows: North side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.

Sunday, March 12 to Saturday, March 18

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., March 12 to Thurs., March 16 
                        Day work (7 a.m. to 5 p.m.) Mon., March 13 to Fri., March 17
Where:   Broad St. at Lombardy St. westward; also saw-cutting at various intersections.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Waterline Relocation:    Allison West
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Station Construction: Science Museum West 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Science Museum West. Street parking impacts are as follows:  North side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.




Friday, February 17, 2017

Pardon Our Dust UPDATE

LANE Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

Work is occurring on Broad Street, with permanent closures of the median and inside lanes, from Hamilton Street to 1st Street. Maintenance of Traffic (MOT) has been established; see last page of this look-ahead for approved messaging on the MOT, which can be shared with stakeholders.

This week, station construction is occurring at Allison East, a median station on Broad Street. Traffic signal work is continuing at intersections along Broad St., at Willow Lawn Drive and from the Boulevard eastward. Median demolition is occurring from the Science Museum westward to Hamilton Street.

Most of the station construction is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. The traffic signal work is occurring during both permitted daytime (7 a.m. to 5 p.m., Monday to Saturday) and nighttime hours (6 p.m. to 6 a.m., Sunday to Thursday).

Details are below. All schedules are weather and progress-dependent.

WEEKLY RECAP:   Sunday, February 12 to Saturday, February 18

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 12 to Thurs., Feb. 16 
             Day work (7 a.m. to 5 p.m.) Mon., Feb. 13 to Fri., Feb. 17
Where:   Broad St. at Willow Lawn Dr., as well as between Boulevard and Allen Ave.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal  intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions.

Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Roadway Work:
Details: Demolition of median curb from Science Museum to Hamilton St.
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the 
eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking has been permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

NOTE: In addition to daytime work hours (7 a.m. to 5 p.m. Monday to Friday), night work (6 p.m. to 6 a.m.) was required Sun., Feb. 12 and Mon., Feb. 13

Sunday, February 19 to Saturday, February 25


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 19 to Thurs., Feb. 23 
             Day work (7 a.m. to 5 p.m.) Mon., Feb. 20 to Fri., Feb. 24
Where:   Broad St. at Willow Lawn Dr., as well as between Boulevard and Allen Ave.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal  intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Roadway Work:
Details: Demolition of median curb from Science Museum to Hamilton St.
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking has been permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Sunday, February 26 to Saturday, March 4


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 26 to Thurs., March 2 
             Day work (7 a.m. to 5 p.m.) Mon., Feb. 27 to Fri., March 3
Where:   Broad St. at Willow Lawn Dr., as well as between Boulevard and Allen Ave.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Roadway Work:
Details: Demolition of median curb from Science Museum to Hamilton St.
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Sunday, March 5 to Saturday, March 11


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., March 5 to Thurs., March 9 
             Day work (7 a.m. to 5 p.m.) Mon., March 6 to Fri., March 10
Where:   Broad St. at Willow Lawn Dr., as well as between Boulevard and Allen Ave.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions.

Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 

Roadway Work:
Details: Demolition of median curb from Science Museum to Hamilton St.
Impacts: No additional traffic impacts; work is within existing work zone.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows:  North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Station Construction: Science Museum West 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Science Museum West. Street parking impacts are as follows: North side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum West is occurring. After completion of station, parking will be restored.

Friday, February 10, 2017

Pardon Our Dust UPDATE

LANE Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

This week, crews began demolition at Allison East, a median station on Broad Street. Traffic signal work continued at intersections along Broad St., from Thompson St. eastward.

Most of the station construction is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. The traffic signal work is occurring during both permitted daytime (7 a.m. to 5 p.m., Monday to Saturday) and nighttime hours (6 p.m. to 6 a.m., Sunday to Thursday).

Traffic will be guided by weighted orange barrels, signage, protective fencing and concrete barriers. They are there for the general safety and well-being of the traveling public, as well as Lane’s workers. Motorists are advised to slow down, obey all traffic signs and watch out for workers and pedestrians when traveling through work zones. Please remember: Orange Cones = NO Phones.

While Lane Construction is committed to work zone safety, accidents can sometimes occur. If you accidentally hit any equipment, such as an orange barrel, please call the GRTC Pulse Construction Hotline, (804) 980-0084.

WEEKLY RE-CAP:   Monday, February 6 to Saturday, February 11

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Mon., Feb. 6 to Fri., Feb. 10 
Day work (7 a.m. to 5 p.m.) Mon., Feb. 6 to Fri., Feb. 10
Where:   Broad St. moving eastward from Cleveland St. to Sheppard St.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal 
intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East: 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).

THREE WEEK LOOK A-HEAD (All schedules are weather and progress-dependent.)

Sunday, February 12 to Saturday, February 18


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 12 to Thurs., Feb. 16 
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 13 to Fri., Feb. 17
Where:   Broad St. moving eastward from Sheppard St. towards Allison St. Broad St. at Willow Lawn Drive
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
NOTE: In addition to daytime work hours (7 a.m. to 5 p.m. Monday to Friday), night work (6 p.m. to 6 a.m.) is required Sun., Feb. 12 and Mon., Feb. 13
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).

Sunday, February 19 to Saturday, February 25


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 19 to Thurs., Feb. 23 
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 20 to Fri., Feb. 24
Where:   Broad St. moving eastward from Boulevard to Terminal Pl.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East: 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).

Sunday, February 26 to Saturday, March 4


Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., Feb. 26 to Thurs., March 2 
                        Day work (7 a.m. to 5 p.m.) Mon., Feb. 27 to Fri., March 3
Where:   Broad St. moving eastward from Terminal Pl. to Allison St.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East: 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).

Here is an image of the available parking on Broad Street from DMV Dr to Allen Ave.: 



Thursday, February 2, 2017

Pardon Our Dust UPDATE

Weekly Re-Cap:   Monday, January 30 to Saturday, February 4
On Tuesday Jan. 31, the median and inside lanes (eastbound & westbound) of Broad Street, from Hamilton Street to 1st Street, closed until the GRTC Pulse median stations in this area are constructed. In addition to the median and inside lane closures, motorists should anticipate lane shifts in areas where median stations are being built. However, there is no need to detour off of Broad Street as two travel lanes in each direction remain open. Lane Construction will uphold MOT at all times.  
Traffic is guided by weighted orange barrels, signage, protective fencing and concrete barriers. They are there for the general safety and well-being of the traveling public, as well as Lane’s workers. Motorists are advised to slow down, obey all traffic signs and watch out for workers and pedestrians when traveling through work zones. Please remember: Orange Cones = NO Phones.  

While Lane Construction is committed to work zone safety, accidents can sometimes occur. If you accidentally hit any equipment, such as an orange barrel, please call the GRTC Pulse Construction Hotline, (804) 980-0084.

Night Work:  Traffic Signals:
When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Jan. 30 to Fri., Feb. 3
Where:   Broad St. moving eastward from Thompson St. towards Altamont Ave.
NOTE: Work is occurring in both eastbound and westbound directions.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal 
intersections.

Median Station Construction:
Timing: Started on Tues., Jan. 31
Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 

Where: Median of Broad St., between Allison St. & Meadow St. 
Timing: Started Tues., Jan. 31
Impacts: Permanent closures of median and inside lanes of Broad St., in both the 
eastbound and westbound directions, at Allison East. Street parking impacts are as follows:
North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.
South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).

LOOK-AHEAD All schedules are weather and progress-dependent. 


Monday, February 6 to Saturday, February 11
Night Work:  Traffic Signals:
When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Feb. 6 to Fri., Feb. 10
Where:   Broad St. moving eastward from Thompson St. towards Altamont Ave.
NOTE: Work is occurring in both eastbound and westbound directions.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal 
intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the 
eastbound and westbound directions, at Allison East. Street parking impacts are as follows:
North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.
South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).


Monday, February 13 to Saturday, February 18
Night Work:  Traffic Signals:
When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Feb. 13 to Fri., Feb. 17
Where:   Broad St. moving eastward from Thompson St. towards Altamont Ave.
NOTE: Work is occurring in both eastbound and westbound directions.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal 
intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the 
eastbound and westbound directions, at Allison East. Street parking impacts are as follows:
North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.
South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).


Monday, February 20 to Saturday, February 25
Night Work:  Traffic Signals:
When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Feb. 20 to Fri., Feb. 24
Where:   Broad St. moving eastward from Thompson St. towards Altamont Ave.
NOTE: Work is occurring in both eastbound and westbound directions.
Impacts:    Temporary single and double lane closures laterally across Broad St. at signal 
intersections.

Median Station Construction:
Impacts: Permanent closures of the median and inside lanes of Broad Street, between
Hamilton St. and 1st St. Two travel lanes remain open in both directions. 

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the 
eastbound and westbound directions, at Allison East. Street parking impacts are as follows:
North side of Broad St (WB direction) between Strawberry St. and Allen Ave.:  parking will be permanently removed.
South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).