Friday, April 28, 2017

Pardon Our Dust UPDATE

This week along Broad Street, construction activity continued at Allison East; Cleveland East and West; and Science Museum East and West stations. Crews also are working on a water line relocation at Staples Mill East. Traffic signal work continued from Adams Street eastward. At Rocketts Landing, crews continued with construction at the Orleans station.

Station construction and water line relocation are occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Traffic signal work is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday. Details are below. All schedules are weather and progress-dependent.

Depending on proximity to the work zone, those in the area could hear portions of the construction work. All work is being done within permitting guidelines, including allowed noise levels.

WEEKLY RE-CAP:   Sunday, April 23 to Saturday, April 29
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 23 to Thurs., April 27 
                        Day work (7 a.m. to 5 p.m.) Mon., April 24 to Fri., April 28 
Where:   Broad St. at intersections from Adams St. towards 5th St. (trenching)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.  Temporary detours possible on eastbound Broad St. where signal work is occurring. Eventually, temporary detours will move to westbound Broad St.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.  At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Details: Station foundation (pending approval of materials)
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Details: Station foundation
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East and West 
Where: Median of Broad St., between Cleveland St. & Altamont St. 
Details: Excavation and foundation installation
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Details: Excavation and foundation installation
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction.  Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, April 30 to Saturday, May 6
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 30 to Thurs., May 4
                        Day work (7 a.m. to 5 p.m.) Mon., May 1 to Fri., May 4
Where:   Broad St. (eastbound and westbound) at intersections of Adams St., Monroe St., 3rd St., 5th St., 6th St.  (trenching)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.  Temporary detours possible on Broad St. where signal work is occurring. 

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.


Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions.  Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.  At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Willow Lawn
Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Details: Station foundation (pending approvals)
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East  
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Details: Station foundation 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard:  Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East and West 
Where: Median of Broad St., between Cleveland St. & Altamont St. 
Details: Excavation and foundation installation
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Details: Station foundation
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Details: Removal of light pole, excavation and station foundation
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.  The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, May 7 to Saturday, May 13
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., May 7 to Thurs., May 11
                        Day work (7 a.m. to 5 p.m.) Mon., May 8 to Fri., May 12
Where:   Broad St. at intersections TBD (trenching)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.  Temporary detours possible on eastbound Broad St. where signal work is occurring. Eventually, temporary detours will move to westbound Broad St.

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Willow Lawn
Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Details: Station foundation (pending approvals)
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Details: Totem and equipment pad (pending approved materials)
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard:  Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East and West 
Where: Median of Broad St., between Cleveland St. & Altamont St. 
Details: Station foundation work
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St.:  Parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St.:  Parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Details: Station foundation
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction.  Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Details: Station foundation 
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, May 14 to Saturday, May 20
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., May 14 to Thurs., May 18
                        Day work (7 a.m. to 5 p.m.) Mon., May 15 to Fri., May 19
Where:   Broad St. at intersections TBD (trenching)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.  Temporary detours possible on eastbound Broad St. where signal work is occurring. Eventually, temporary detours will move to westbound Broad St.

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Willow Lawn
Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Details: Station foundation (pending approvals)
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Details: Totem and equipment pad (pending approved materials)
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East and West 
Where: Median of Broad St., between Cleveland St. & Altamont St. 
Details: Station foundation work
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St.: parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Details: Station foundation
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Details: Station foundation 
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions. The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.


Friday, April 21, 2017

Pardon Our Dust UPDATE

This week along Broad Street, construction activity continued at Allison East, Cleveland East and Science Museum West and East stations. Crews also are working on a water line relocation at Staples Mill East. Traffic signal work continued from Foushee Street eastward. At Rocketts Landing, crews continued with construction at the Orleans station. On Main Street, crews are preparing to begin construction activity at the Shockoe Bottom East station.

Station construction, demolition and water line relocation are occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Traffic signal work is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday. Details are below. All schedules are weather and progress-dependent.

Depending on proximity to the work zone, those in the area could hear portions of the construction work. All work is being done within permitting guidelines, including allowed noise levels.

WEEKLY RECAP:   Sunday, April 16 to Saturday, April 22

Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 16 to Thurs., April 20
                        Day work (7 a.m. to 5 p.m.) Mon., April 17 to Fri., April 21
Where:   Broad St. at intersections from Foushee St. to 2nd St.  (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions.  Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.  At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.  parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum East and West stations 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard:  Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally, the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, April 23 to Saturday, April 29
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 23 to Thurs., April 27 
                        Day work (7 a.m. to 5 p.m.) Mon., April 24 to Fri., April 28 
Where:   Broad St. at intersections from 2nd St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.  At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East 
Where: Median of Broad St., between Tilden St. & Wayne St. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions. The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, April 30 to Saturday, May 6
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 30 to Thurs., May 4
                        Day work (7 a.m. to 5 p.m.) Mon., May 1 to Fri., May 4
Where:   Broad St. at intersections from 4th St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.  At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Willow Lawn
Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East s
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East 
Where: Median of Broad St., between Tilden St. & Wayne St. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions. The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, May 7 to Saturday, May 13
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., May 7 to Thurs., May 11
                        Day work (7 a.m. to 5 p.m.) Mon., May 8 to Fri., May 12
Where:   Broad St. at intersections from 5th St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Willow Lawn
Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.:  parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum West and East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard:  Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East 
Where: Median of Broad St., between Tilden St. & Wayne St. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Tilden St. and Wayne St.:  Parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Shockoe Bottom East 
Where: East Main Street, eastbound between 24th and 25th Streets
Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.The sidewalk within the construction zone will be closed during construction.  Parking will be temporarily removed in this location. 

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.



Thursday, April 13, 2017

Pardon Our Dust UPDATE

Lane Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. Work is occurring on Broad Street, with permanent closures of the median and inside lanes, from Hamilton Street to 1st Street. Maintenance of Traffic (MOT) has been established; see last page of this look-ahead for messaging on the MOT, to be shared with stakeholders.

This week along Broad Street, demolition of the median continued between Hamilton Street and 1st Street. Demolition to begin construction occurred at the Science Museum East station. Construction continued at Allison East, and crews are preparing to begin water line relocation at Staples Mill East.
Traffic signal work continued from Belvidere Street eastward. At Rocketts Landing, crews continued with construction at the Orleans station.

Within the median MOT, concrete barriers were set this week in preparation for station construction at Cleveland East and Science Museum East stations.

Station construction, demolition and water line relocation are occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Traffic signal work is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday.

Depending on proximity to the work zone, those in the area could hear portions of the construction work. All work is being done within permitting guidelines, including allowed noise levels.

All schedules are weather and progress-dependent.

WEEKLY RE-CAP:   Sunday, April 9 to Thursday, April 13  
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 9 to Thurs., April 13
                        Day work (7 a.m. to 5 p.m.) Mon., April 10 to Fri., April 14
Where:   Broad St. at intersections from Belvidere St. to 5th St. and Broad St. from Thompson St. eastward
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Median Demolition:
Where: I-195 Crossing to Allison St.
Impacts: No additional traffic impacts; work is within existing work zone.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Monday, April 17 to Saturday, April 23
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 16 to Thurs., April 20
                        Day work (7 a.m. to 5 p.m.) Mon., April 17 to Fri., April 21
Where:   Broad St. at intersections from Adams St. to 2nd St.  and Broad St. from Thompson St. eastward
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed.  South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, April 23 to Saturday, April 29
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 23 to Thurs., April 27
                        Day work (7 a.m. to 5 p.m.) Mon., April 24 to Fri., April 28
Where:   Broad St. at intersections from 5th St. eastward and Broad St. from Thompson St. eastward
Impacts:  Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard:  Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Sunday, April 30 to Saturday, May 6
Traffic Signals:
When: Night work (6 p.m. to 6 a.m.) Sun., April 30 to Thurs., May 4
                        Day work (7 a.m. to 5 p.m.) Mon., May 1 to Fri., May 4
Where:   Broad St. at intersections from 5th St. eastward and Broad St. from Thompson St. eastward
Impacts:   Temporary single and double lane closures laterally across Broad St. at signal intersections.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.

Median MOT:
Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Water Line Relocation: Staples Mill East
Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.

Station Construction: Allison East 
Where: Median of Broad St., between Allison St. & Meadow St. 
Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Science Museum East 
Where: Median of Broad St., between Robinson St. & Terminal Pl. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.  South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Cleveland East 
Where: Median of Broad St., between Tilden St. & Wayne St. 
Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St.:  Parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Station Construction: Orleans 
Where: Orleans Street (at Rocketts Landing)
Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction.  Parking on Orleans Street will be temporarily removed during construction.

Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.