LANE Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn. This week, rain and inclement weather prevented LANE from performing construction activity on Mon., Jan. 23. Work resumed on Tues., Jan. 24, with continuation of roadway work on the north side of westbound Broad St. Traffic signal work continued at intersections throughout the Pulse corridor.
Most of the work in the look-ahead is occurring during permitted work hours from 7 a.m. to 5 p.m., Monday to Saturday. On Thursday, Jan. 26, night work (6 p.m. to 6 a.m.) was required for traffic signal work on Broad St. starting at Thompson St. and progressing eastward. Night work is expected to continue through the coming weeks, at signal intersections throughout the entire Pulse corridor.
Most of the work in the look-ahead is occurring during permitted work hours from 7 a.m. to 5 p.m., Monday to Saturday. On Thursday, Jan. 26, night work (6 p.m. to 6 a.m.) was required for traffic signal work on Broad St. starting at Thompson St. and progressing eastward. Night work is expected to continue through the coming weeks, at signal intersections throughout the entire Pulse corridor.
All schedules are weather and progress-dependent.
Starting Mon., Jan. 30, the median and inside lanes (eastbound & westbound) of Broad St., from Hamilton St. to 1st St., are expected to close until the GRTC Pulse median stations in this area are constructed. In addition to the median and inside lane closures, motorists should anticipate lane shifts in areas where median stations are being built. Lane Construction will uphold MOT at all times.
Traffic will be guided by weighted orange barrels, signage, protective fencing and concrete barriers. They are there for the general safety and well-being of the traveling public, as well as Lane’s workers. Motorists are advised to slow down, obey all traffic signs and watch out for workers and pedestrians when traveling through work zones. Please remember: Orange Cones = NO Phones.
While Lane Construction is committed to work zone safety, accidents can sometimes occur. If you accidentally hit any equipment, such as an orange barrel, please call the GRTC Pulse Construction Hotline, (804) 980-0084.
WEEKLY RECAP: Monday, January 23 to Saturday, January 28
Roadway Construction:
• Where: North side of westbound Broad St., between Allison St. and Strawberry St.
• Where: North side of westbound Broad St., between Allison St. and Strawberry St.
• Impacts: Temporary closures of the westbound curb lane and adjacent sidewalk, as well as temporary loss of street parking, from Allison St. to Strawberry St.
Traffic Signal Work:
• Where: Broad St., 14th St. and Main St. (entire Pulse route)
• Impacts:Temporary closure of curb lane, adjacent sidewalk and bus stops in affected areas.
NOTE: Work is occurring in both eastbound and westbound directions.
NOTE: Work is occurring in both eastbound and westbound directions.
Night Work: Traffic Signals:
• Where: Broad St. moving eastward from Thompson St. towards Altamont Ave.
• When: Thurs., Jan. 26, from 6 p.m. to 6 a.m.
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
Monday, January 30 to Saturday, February 4
Roadway Construction:
• Where: North side of westbound Broad St., between Allison St. and Strawberry St.
• Details: Upon completion of roadway work, westbound traffic will be shifted back into north side lanes in this location, to allow for MOT at Allison stations.
• Timing: Mon., Jan. 30
Traffic Signals (Night Work):
• When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Jan. 30 to Fri., Feb. 3
• Where: Broad St. moving eastward from Thompson St. towards Altamont Ave.
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
NOTE: Work is occurring in both eastbound and westbound directions.
Median Station Construction:
• Timing: This is estimated to begin on Tues., Jan. 31
• Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions.
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Timing: This is estimated to begin on Tues., Jan. 31
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the
eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).
Monday, February 6 to Saturday, February 11
• When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Feb. 6 to Fri., Feb. 10
• Where: Broad St. moving eastward from Thompson St. towards Altamont Ave.
• Where: Broad St. moving eastward from Thompson St. towards Altamont Ave.
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
NOTE: Work is occurring in both eastbound and westbound directions.
Median Station Construction:
• Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions.
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).
• When: This is requiring night work (6 p.m. to 6 a.m.) from Mon., Feb. 6 to Fri., Feb. 10
• Where: Broad St. moving eastward from Thompson St. towards Altamont Ave.
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
NOTE: Work is occurring in both eastbound and westbound directions.
Median Station Construction:
• Impacts: Permanent closures of the median and inside lanes of Broad Street, between Hamilton St. and 1st St. Two travel lanes remain open in both directions.
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the
eastbound and westbound directions, at Allison East. Street parking impacts are as follows: North side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking will remain where it currently exists, except for two parking spaces and one loading zone in front of the Bookbindery Building’s parking deck (east of the parking deck’s entrance).
No comments: