This week on Broad Street, station construction continued at Willow Lawn; Staples Mill East and West; Cleveland East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; and VCU Hospital East and West. On E. Main Street, construction continued at Main St. Station East and West; Shockoe Bottom East and West; East Riverfront East and West; and Orleans. Permanent striping of Pulse bus-only lanes is occurring at several locations on Broad Street and E. Main St.
Maintenance of Traffic (MOT) has been established where work is occurring; see last page of this look-ahead for messaging on the MOT, to be shared with stakeholders.
Most station construction is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Other work relating to roadway, traffic signals and station canopy installation is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday. Details are below. All schedules are weather and progress-dependent.
WEEKLY RECAP
Sunday, January 21 to Saturday, January 27
Roadway Work
When: Mon., Jan. 22 to Sat., Jan. 27 (7 am to 5 pm)
Where: Broad St. & Main St.
What: Permanent striping along project route
Impacts: No MOT or traffic impacts.
When: Mon., Jan. 22 to Sat., Jan. 27 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: No activity scheduled
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Coping (East station); Equipment pad (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: No activity scheduled
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: Coping (West station)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: No activity scheduled
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed. South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed. South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Station bricks (East station); Metal roofing (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Pour station ramps / Pour median walkway / Totem signage (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Totem signage (East station); Station bricks (West station); Totem bricks (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: Totem bricks (West station); Totem signage / Coping / Metal roofing (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Paint canopy (East station); Totem bricks / Totem signage (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: Form & Pour footer / Blocks (East station); Paint canopy / Bench brackets & Waterproofing (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Waterproofing (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: No activity scheduled
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Architectural slab: Brick pavers
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
What: Architectural slab: Brick pavers
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
LOOK A-HEAD
Sunday, January 28 to Saturday, February 3
When: Mon., Jan. 29 to Sat., Feb. 3 (7 am to 5 pm)
Where: Broad St. & Main St.
What: Demolition & Removal of median junction boxes; Station and intersection paving; Permanent striping along project route
Impacts: No MOT or traffic impacts.
Impacts: No MOT or traffic impacts.
When: Mon., Jan. 29 to Sat., Feb. 3 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Cedar ceiling / Totem signage
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Ceiling framing / Place conduit & Pull wire / Install lighting (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Place conduit & Pull wire (East station); Pour median walkway / Install lighting / Cedar ceiling (both stations)
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: Coping / Ceiling Framing / Place conduit & Pull wire (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Place conduit & Pull wire / Install lighting / Cedar ceiling / Median walkway (East station); Ceiling framing (West station)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed. South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Ceiling framing (East station); Totem brick / Architectural slab & Ramps (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Pour median walkway / Ceiling framing (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Ceiling framing (East station); Form & Pour architectural slab & ramps (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: Ceiling framing (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Paint canopy / Excavate & Pour bus pad / Install plywood & Waterproofing on roof / Station bricks (East station); Form-Pour architectural slab (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: Blocks / Backfill footer & Form structural slab / Form storm drain top (East station);Station bricks / Install metal roofing / Totem brick (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Ceiling framing / Place conduit & Pull wire / Install lighting (East station); Station bricks / Install metal roofing / Totem brick (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Ceiling framing / Place conduit & Pull wire / Install lighting / Coping / Cedar ceiling (both stations)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Place conduit & Pull wire / Install lighting
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
What: Place conduit & Pull wire / Install lighting
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Sunday, February 4 to Saturday, February 10
Roadway Work
When: Mon., Feb. 5 to Sat., Feb.10 (7 am to 5 pm)
Where: Broad St. & Main St.
What: Demolition & Removal of median junction boxes
Station Work
When: Mon., Feb. 5 to Sat., Feb. 10 (7 am to 5 pm)
Sunday, February 11 to Saturday, February 17
Station Work
When: Mon., Feb. 12 to Sat., Feb. 17 (7 am to 5 pm)
Sunday, February 4 to Saturday, February 10
Roadway Work
When: Mon., Feb. 5 to Sat., Feb.10 (7 am to 5 pm)
Where: Broad St. & Main St.
What: Demolition & Removal of median junction boxes
Impacts: No MOT or traffic impacts.
Station Work
When: Mon., Feb. 5 to Sat., Feb. 10 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. / Pull wire & Set lights (East station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Ceiling framing / Pull wire & Set lights / Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: Ceiling Framing / Form & Pour median walkway / Pull wire & Set lights (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. (East station);Ceiling framing / Form-Pour median walkway / Pull wire & Set lights (West station)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed. South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Ceiling framing (East station); Totem signage / Coping (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Coping / Ceiling framing / Pull wire & Set lights (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Ceiling framing / Pull wire & Set lights / Cedar soffit system (East station);Architectural slab / Ceiling framing (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: Ceiling framing (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Station bricks / Totem bricks / Totem signage / Coping (East station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: Backfill footer & Form structural slab-storm drain top / Set steel structure / Field welding canopy / Form equipment pad - Night work (East station); Totem brick / Totem signage (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Ceiling framing / Pull wire & Set lights (East station);Station bricks / Totem brick / totem signage / Coping (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Ceiling framing / Pull wire & Set lights (both stations)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Ceiling framing / Pull wire & Set lights
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
What: Ceiling framing / Pull wire & Set lights
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Sunday, February 11 to Saturday, February 17
Station Work
When: Mon., Feb. 12 to Sat., Feb. 17 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Install finishes: hand rails, lean rails, push buttons, etc. / Install glazing
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Install finishes: hand rails, lean rails, push buttons, etc. / Install glazing (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Install finishes: hand rails, lean rails, push buttons, etc. / Install glazing (both stations)
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: Pull wire & Set lights / Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Install glazing (East station); Cedar soffit system (West station); Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed. South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Ceiling framing (West station); Pull wire & Set lights (both stations)
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Install glazing (East station); Ceiling framing / Set communications cabinet / Pull wire & Set lights / Cedar soffit system (West station); Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: Ceiling framing / Pull wire & Place lights / Cedar soffit system (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Cedar soffit system (West station); Ceiling framing / Pull wire & Set lights (both stations)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: Field welding canopy / Paint canopy / Bench brackets & Waterproofing / Excavate & Pour bus pad (East station); Ceiling framing / Pull wire & Set lights (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Cedar soffit system / Install finishes (East station); Ceiling framing / Pull wire & Set lights (West station)
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc. (both stations)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What:Install communications cabinet / Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
What:Install communications cabinet / Cedar soffit system / Install finishes: hand rails, lean rails, push buttons, etc.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.