This week on Broad Street, station construction continued at Willow Lawn; Staples Mill East and West; Cleveland East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; and VCU Hospital West. On E. Main Street, station construction continued at Main Street Station East and West; Shockoe Bottom East; East Riverfront East and West; and Orleans. Night roadway work began on eastbound Broad St., starting at Thompson St. heading east. Traffic signal work is continuing on Broad Street and Main St.
Most of construction activity is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Traffic signal work is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday. Details are below. All schedules are weather and progress-dependent.
WEEKLY RECAP
Sunday, October 15 to Saturday, October 21
Where: Broad St. at 2nd St., Allison St., Boulevard, 11th St., Cleveland St., Foushee St., Terminal Pl., Robinson St., DMV Dr., Ryland St., Monroe St., Shafer St. Tilden St.; Convention Center East, Government Center West, VCU Hospital East, Main St. Station East; Main St. at Orleans St.
Roadway Work
Station Construction
When: Mon., Oct. 16 to Sat., Oct. 21 (7 am to 5 pm)
Sun., October 29 to Saturday, November 4
Sun., November 5 to Saturday, November 11
Traffic Signal Work
When: Sun., Oct. 15 to Thur., Oct. 19 (6 pm to 6 am) and Mon., Oct. 16 to Fri., Oct. 20 (7 am to 5 pm)Where: Broad St. at 2nd St., Allison St., Boulevard, 11th St., Cleveland St., Foushee St., Terminal Pl., Robinson St., DMV Dr., Ryland St., Monroe St., Shafer St. Tilden St.; Convention Center East, Government Center West, VCU Hospital East, Main St. Station East; Main St. at Orleans St.
What: Pedestrian Poles and Heads, Junction Boxes, Bollard Poles, Tie-Ins, Backfilling, Trenching
Impacts: Temporary single and double lane closures at signal intersections. Temporary
detours possible on Broad St., 14th St. and Main St., where signal work is occurring. Work is mobile, subject to change, and permitted anywhere along the Pulse route.
Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.
Roadway Work
When: Sun., Oct. 15 to Fri., Oct. 20 (8 pm to 6 am)
Where: EB Broad St., from Thompson St. eastward to VCU Hospital; Shockoe Bottom Station between 25th and 26th Sts.
What: Night Work: Milling / Asphalt / Striping for new bus lane; Striping and MOT switch
Impacts: No MOT or traffic impacts.
What: Night Work: Milling / Asphalt / Striping for new bus lane; Striping and MOT switch
Impacts: No MOT or traffic impacts.
Station Construction
When: Mon., Oct. 16 to Sat., Oct. 21 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: No activity scheduled
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: No activity scheduled
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Install bench brackets / Final painting of canopy (East station); Install bench brackets / Bricks: kneewall & totem (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: No activity scheduled
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Bricks: Kneewall & Totem / Final roofing (East station); Night work: Set steel structure (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed.
South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Curb in landscape and ramps (both stations)
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Curb in landscape (both stations); Excavation of landscape and topsoil placement (East station)
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Station excavation (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: No activity scheduled
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: No activity scheduled
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: No activity scheduled
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Shockoe Bottom East/West (Curb Stations)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Install bench brackets / Bricks – station & totem (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Final painting of canopy (both stations); Install bench brackets (East station)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Final painting of canopy
What: Final painting of canopy
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
LOOK A-HEAD
LOOK A-HEAD
Roadway Work
Station Construction
When: Mon., Oct. 23 to Sat., Oct. 28 (7 am to 5 pm)
When: Sun., Oct. 22 to Fri., Oct. 27 (8 pm to 6 am)
Where: EB Broad St., from Thompson St. eastward to VCU Hospital
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
Station Construction
When: Mon., Oct. 23 to Sat., Oct. 28 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Final painting of canopy / Bench brackets
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Final painting of canopy (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Install bench brackets / Final painting of canopy (East station); Bricks – kneewall & totem / Install roofing (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: TBD
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Bricks: Kneewall & Totem / Underdrain / Bus pad / Ceiling & Electrical work (East station); Bus pad (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed.
South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Set steel structure - Night work (both stations)
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Curb in landscape (East station)
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Footers - pour concrete (West station); Bus pad – pour concrete (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: Bus pad – pour concrete (both stations)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: TBD
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: TBD
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Shockoe Bottom East/West (Curb Stations)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Bricks: station & totem / Underdrain; Demolition (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Brick: station & totem (both stations); Bench brackets (West station)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Bench brackets
What: Bench brackets
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Sun., October 29 to Saturday, November 4
Roadway Work
Station Construction
When: Mon., Oct. 30 to Sat., Nov. 4 (7 am to 5 pm)
When: Sun., Oct. 29 to Fri., Nov. 3 (8 pm to 6 am)
Where: WB Broad St., from Thompson St. eastward to VCU Hospital
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
Station Construction
When: Mon., Oct. 30 to Sat., Nov. 4 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Final painting of canopy / Brick: station & totem
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Final painting of canopy (both stations)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: Bus pad / Pour concrete (both stations)
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: Final painting of canopy (East station); Bus pad / Bench brackets (both stations)
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Architectural slab (East station); Bus pad / concrete (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed.
South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: TBD
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: Set steel structure - Night work (both stations)
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Backfill footer & structural slab (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: TBD
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Backfill for structural slab (West station); Station excavation (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: Install helical piles (West station); Install micropiles (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Architectural Slab (East station); Footers – pour concrete (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: Architectural Slab (both stations); Brick: station & totem / Underdrain (West station)
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Brick: station & totem
What: Brick: station & totem
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Sun., November 5 to Saturday, November 11
Roadway Work
Station Construction
When: Mon., Nov. 6 to Sat., Nov. 11 (7 am to 5 pm)
When: Sun., Nov. 5 to Sat., Nov. 11 (8 pm to 6 am)
Where: WB Broad St., from Thompson St. eastward to VCU Hospital
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
What: Night Work: Milling / Asphalt / Striping for new bus lane
Impacts: No MOT or traffic impacts.
Station Construction
When: Mon., Nov. 6 to Sat., Nov. 11 (7 am to 5 pm)
Willow Lawn (Curb Station)
Where: EB Broad St., btwn Byrd Ave & Willow Lawn Dr.
What: Brick: station & totem / Architectural Slab / Underdrain
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Staples Mill East/West (Curb Stations)
Where: Eastbound Broad St., between Staples Mill Rd. & Blacker St.
What: Brick: station & totem (both stations)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Cleveland East/West (Median Stations)
Where: Broad St. between Cleveland St. & Altamont St.
What: TBD
Parking Impacts: North side of Broad St (WB direction) parking will be temporarily removed while construction of Cleveland stations is occurring. After completion of stations, some parking will be restored between Sheppard St. and Boulevard; west of MacTavish St.; and between Roseneath Rd. and I-195 overpass. South side of Broad St. (EB direction) parking will be permanently removed from I-195 overpass to Boulevard.
Station Impacts: Left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring. Lane shifts are in effect. Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St.
Science Museum East/West (Median Stations)
Where: Broad St. btwn Robinson St. & Terminal Pl.
What: TBD
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed from the Science Museum entrance to near Terminal Pl. After completion of station, some parking will be restored near Terminal Pl. South side of Broad St. (EB direction) parking will be permanently removed between the Boulevard to Strawberry St. After completion of station, a few parking spaces will be restored west of Robinson St. and west of Strawberry St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Allison East/West (Median Stations)
Where: Broad St. between Meadow St. & Strawberry St.
What: Bench brackets (West station)
Parking Impacts: North side of Broad St (WB direction) parking will be permanently removed.
South side of Broad St. (EB direction) parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
VCU&VUU East/West (Median Stations)
Where: Broad St. between Shafer St. & Laurel St.
What: Bench brackets (East station)
Parking Impacts: North Side of Broad St. (WB direction) parking will be permanently removed from Harrison St. to Belvidere St. After completion of station, some parking will be restored west of Harrison St., near the Siegel Center. South side of Broad St. (EB direction) parking will be temporarily removed across from Hancock St. to Laurel St. After completion of station, some parking will be restored east and west of Shafer St.
Station Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. Lane shifts are in effect.
Arts District East / West (Median Stations)
Where: Broad St. between Foushee St. and Jefferson St.
What: TBD
Parking Impacts: North side of Broad St. (WB direction): Parking will be temporarily removed between Brook Road and approx. 90 ft. west of Jefferson Street. South side of Broad St. (EB direction): Parking will be temporarily removed from approx. 120 ft. west of Jefferson Street to approx. 75 ft. east of Foushee Street.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Convention Center East / West (Curb Stations)
Where: Broad St., between 2nd St. & 5th St.
What: Backfill footer & structural slab (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Government Center East/West (Curb Stations)
Where: Broad St. between 8th & 10th Sts.
What: TBD
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
VCU Hospital East/West (Curb Stations)
Where: Broad St., between 11th St. & 12th St.
What: Footers / Rebar / Pour concrete (East station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Main St. Station East/West (Curb Stations)
Where: E. Main St., between 15th Street & 17th Street
What: TBD
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
Shockoe Bottom East/West (Curb Station)
Where: E. Main St. eastbound, between 24th & 25th St.
What: Backfill – footers & structural slab (West station)
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
East Riverfront East/West (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What: TBD
Station Impacts: East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.
Orleans: Orleans St. (Curb Station)
Where: Orleans St. at Rocketts Landing
What: Brick: station & totem / Architectural Slab / Underdrain
What: Brick: station & totem / Architectural Slab / Underdrain
Parking Impacts: Construction will temporarily close sidewalks and a portion of curb lanes, where stations are being built. Parking will be temporarily removed, where station construction is occurring.
Station Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Sidewalks within construction zones will be closed during construction.
No comments:
Post a Comment