This week on Broad Street, construction activity continued at Allison East; Cleveland East and West; and Science Museum East and West stations. Demolition of the Broad Street median continued, from Belvidere St. eastward. Crews also continued the water line relocation at Staples Mill East. Traffic signal work continued from 5th Street eastward, as well as from Roseneath Rd. eastward. On E. Main Street, construction continued at East Riverfront East station and at the Orleans station in Rocketts Landing. Work also began at the Shockoe Bottom East station.

Weekly RE-CAP Sun., May 7 - Sat., May 13

Traffic Signal Work
When:  Sun., May 7 to Thurs., May 11 (6 p.m. to 6 a.m.) and Mon., May 8 to Fri., May 12 (7 a.m. to 5 p.m.)
Where: Broad St. (EB/WB) at 5th St., 6th St., 11th St., 12th St., 14th St., Old 14th St. (trenching)
and Broad St. at Roseneath Rd./Tilden St., Altamont St./Sheppard St., Robinson St./N. Davis St. (cabinet foundations)
Impacts:  Temporary single and double lane closures at signal intersections. Temporary detours possible on Broad St., 14th St. and Main St., where signal work is occurring. 

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Roadway Work
When: Mon., May 8 to Sat., May 13 (7 a.m. to 5 p.m.)
Where: Broad St. from Belvidere St. eastward
What:  Median demolition
Impacts: No additional traffic impacts; work is within existing median MOT.

Water Line Work
When:   Mon., May 8 to Fri., May 11 (7 a.m. to 5 p.m.)
Where:  Staples Mill East, Broad St. eastbound, between Chantilly St. and Blacker St.
Impacts: Temporary closure of the sidewalk and curbside lane of eastbound Broad St.

Station Construction
When: Mon., May 8 to Sat., May 13 (7 a.m. to 5 p.m.)

Allison East (Median Station)
Where:  Broad St., btwn Allison St. & Meadow St.  
What:  Station Foundation (pending receipt of masonry)

Science Museum East/West (Median Stations)
Where: Between Robinson St. & Terminal Pl.
What:   Station Foundation

Cleveland East/West (Median Stations)
Where: Between Cleveland St. & Altamont St.
What:  Station Foundation

Orleans:  Orleans St. (Curb Station)
Where: Rocketts Landing  
What:  Excavation and Grading

East Riverfront East (Curb Station)
Where: E. Main St., btwn Ash St. & Nicholson St.
What:  Excavation & Station Foundation

Shockoe Bottom East (Curb Station)
Where:  E. Main St. eastbound, between 24th & 25th Sts.
What:  Removal of light poles & Excavation

Impacts include the following: 
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Median Station Impacts:
Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. 
Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Curb Station Impacts:
A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. 
Sidewalks within construction zones will be closed during construction. 
Parking will be temporarily removed, where station construction is occurring.
East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.

Sunday, May 14 to Saturday, May 20
Traffic Signal Work
When:  Sun., May 14 to Thurs., May 18 (6 p.m. to 6 a.m.) and Mon., May 15 to Fri., May 19 (7 a.m. to 5 p.m.)
Where: Broad St. at 12th St., 14th St., Old 14th St. (trenching), Franklin St. at 14th St. (trenching), E. Main St. at 14th St. (trenching) and Broad St. at Roseneath Rd./Tilden St., Altamont St./Sheppard St., Robinson St./N. Davis St. (cabinet foundations)
Impacts:  Temporary single and double lane closures at signal intersections. Temporary detours possible on Broad St., 14th St. and Main St., where signal work is occurring. 

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.


Roadway Work
When:  Mon., May 15 to Sat., May 20 (7 a.m. to 5 p.m.)
Where: Broad St. from Belvidere St. eastward
What:  Median demolition
Where: Broad St. from Lombardy St. westward
What: Preparing for median paving
Impacts: No additional traffic impacts; work is within existing median MOT.

Water Line Work
When: Mon., May 15 to Fri., May 18 (7 a.m. to 5 p.m.)
Where:  Staples Mill East, Broad St. eastbound, between Chantilly St. and Blacker St.
Impacts: Temporary closure of the sidewalk and curbside lane of eastbound Broad St.

Station Work  
When: Mon., May 15 to Sat., May 20 (7 a.m. to 5 p.m.)

Allison East (Median Station)
Where:  Broad St., btwn Allison St. & Meadow St.  
What: Station Foundation (pending receipt of masonry)

Science Museum East/West (Median Stations)
Where:  Between Robinson St. & Terminal Pl.
What:  Totem, Kneewall & Equipment Pad 

Cleveland East/West (Median Stations)
Where: Between Cleveland St. & Altamont St.
What:   Station Foundation

Orleans (Curb Station)
Where: Orleans St. at Rocketts Landing  
What: Excavation and Grading

East Riverfront West/East (Curb Stations)
Where:  E. Main St., btwn Ash St. & Nicholson St.
What:  Station Foundation / Excavation

Shockoe Bottom East (Curb Station)
Where:  E. Main St. eastbound, between 24th & 25th Sts.
What:   Station Foundation /  Excavation

Impacts include the following: 
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Median Station Impacts:
Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. 
Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Curb Station Impacts:
A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. 
Sidewalks within construction zones will be closed during construction. 
Parking will be temporarily removed, where station construction is occurring.
East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.

Sunday, May 21 to Saturday, May 27
Traffic Signal Work
When: Sun., May 21 to Thurs., May 25 (6 p.m. to 6 a.m.) and Mon., May 22 to Fri., May 26 (7 a.m. to 5 p.m.)
Where:  E. Main St. at 14th St., 17th St., 18th St., 25th St., (trenching) and Orleans St. (trenching)
Impacts:  Temporary single and double lane closures at signal intersections. Temporary detours possible on Broad St., 14th St. and Main St., where signal work is occurring. 

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Roadway Work
When:  Mon., May 22 to Fri., May 26 (7 a.m. to 5 p.m.)
Where: Broad St. from Belvidere St. eastward
What:  Median demolition
Where:  Broad St. from Lombardy St. westward
What:  Median paving
Impacts: No additional traffic impacts; work is within existing median MOT.

Water Line Work
When: Mon., May 22 to Fri., May 26 (7 a.m. to 5 p.m.) 
Where:  Willow Lawn, Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts:  Temporary closure of the sidewalk and curbside lane of eastbound Broad St.

Station Work 
When:  Mon., May 22 to Sat., May 27 (7 a.m. to 5 p.m.)

Allison East (Median Station)
Where:  Broad St., btwn Allison St. & Meadow St.  
What:  Station Foundation / Masonry

Science Museum East/West (Median Stations)
Where:  Robinson St. & Terminal Pl.
What:  Station Foundation / Kneewall

Cleveland East/West (Median Stations)
Where:  Between Cleveland St. & Altamont St.
What: Station Foundation

VCU/VUU East (Median Station) 
Where: Between Shafer St. & Laurel St.
What:  Excavation

Orleans (Curb Station) 
Where:  Orleans St. at Rocketts Landing  
What:  Station Foundation

East Riverfront West/East (Curb Station) 
Where: E. Main St., btwn Ash St. & Nicholson St.
What:  Station Foundation

Shockoe Bottom East (Curb Station) 
Where:  E. Main St. eastbound, between 24th & 25th Sts.
What:  Station Foundation

Willow Lawn (Curb Station)
Where: Eastbound Broad St., btwn Byrd Ave. & Willow Lawn Dr.
What:  Set Barrier / MOT (progress dependent)

Staples Mill West (Curb Station)
Where:  WB Broad St., btwn Staples Mill Rd. & Maywill St.
What:   Set Barrier / MOT (progress dependent)

Impacts include the following: 
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Median Station Impacts:
Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. 
Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Curb Station Impacts:
A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. 
Sidewalks within construction zones will be closed during construction. 
Parking will be temporarily removed, where station construction is occurring.
East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.

Tuesday, May 30 to Saturday, June 3
Traffic Signal Work
When:  Tues., May 30 to Thurs., June 1 (6 p.m. to 6 a.m.) and Tues., May 30 to Fri., June 2 (7 a.m. to 5 p.m.)
Where:  Intersections TBD
Impacts:  Temporary single and double lane closures at signal intersections. Temporary detours possible on Broad St., 14th St. and Main St., where signal work is occurring. 

Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.

Roadway Work
When: Tues., May 30 to Sat., June 3 (7 a.m. to 5 p.m.)
Where: Broad St. from Lombardy St. westward
What:  Median paving

Water Line Work
When:  Tues., May 30 to Fri., June 2 (7 a.m. to 5 p.m.)
Where:  Willow Lawn, Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
Impacts:  Temporary closure of the sidewalk and curbside lane of eastbound Broad St.

Station Construction
When:  Tues., May 30 to Sat., June 3 (7 a.m. to 5 p.m.)

Allison East (Median Station) 
Where:  Broad St., btwn Allison St. & Meadow St.  
What:  Station Foundation / Install Comms / Structural Concrete

Science Museum East/West (Median Stations)
Where:  Between Robinson St. & Terminal Pl.
What:  Station Foundation / Install Comms / Structural Concrete

Cleveland East/West (Median Stations)  
Where:  Between Cleveland St. & Altamont St.
What:  Station Foundation

VCU/VUU East (Median Station)  
Where:  Between Shafer St. & Laurel St.
What:  Excavation

Orleans (Curb Station) 
Where:  Orleans St. at Rocketts Landing  
What:  Station Foundation

East Riverfront West/East (Curb Stations)
Where: E. Main St., between Ash St. & Nicholson St.
What:  Station Foundation

Shockoe Bottom East (Curb Station)
Where:  E. Main St. eastbound, between 24th & 25th Sts.
What:  Station Foundation

Staples Mill East (Curb Station)
Where: Eastbound Broad St., between Chantilly St. & Blacker St.
What:  Excavation

Impacts include the following: 
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.

Median Station Impacts:
Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, from Hamilton St. to 1st St. 
Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. 
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.

Curb Station Impacts:
A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. 
Sidewalks within construction zones will be closed during construction. 
Parking will be temporarily removed, where station construction is occurring.
East Riverfront East and West stations are within an area that is already closed due to city’s existing East Riverfront Redevelopment project. No MOT is required.