Station construction, demolition and water line relocation are occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday. Traffic signal work is occurring during both permitted daytime and nighttime hours, 6 p.m. to 6 a.m., Sunday to Thursday. Details are below. All schedules are weather and progress-dependent.
Depending on proximity to the work zone, those in the area could hear portions of the construction work. All work is being done within permitting guidelines, including allowed noise levels.
WEEKLY RECAP: Sunday, April 16 to Saturday, April 22
Traffic Signals:
• When: Night work (6 p.m. to 6 a.m.) Sun., April 16 to Thurs., April 20
Day work (7 a.m. to 5 p.m.) Mon., April 17 to Fri., April 21
• Where: Broad St. at intersections from Foushee St. to 2nd St. (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.
Median MOT:
• Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.
Water Line Relocation: Staples Mill East
• Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
• Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Science Museum East and West stations
• Where: Median of Broad St., between Robinson St. & Terminal Pl.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard: Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Orleans
• Where: Orleans Street (at Rocketts Landing)
• Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally, the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Shockoe Bottom East
• Where: East Main Street, eastbound between 24th and 25th Streets
• Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Sunday, April 23 to Saturday, April 29
Traffic Signals:
• When: Night work (6 p.m. to 6 a.m.) Sun., April 23 to Thurs., April 27
Day work (7 a.m. to 5 p.m.) Mon., April 24 to Fri., April 28
• Where: Broad St. at intersections from 2nd St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes equipment cutting across streets and intersections.
Median MOT:
• Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.
Water Line Relocation: Staples Mill East
• Where: Broad St., opposite Maywill St., between Chantilly St. and Blacker St.
• Impacts: Temporary closure of the curbside lane of Broad St., between Chantilly St. and Blacker St., heading eastbound.
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Science Museum West and East
• Where: Median of Broad St., between Robinson St. & Terminal Pl.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Cleveland East
• Where: Median of Broad St., between Tilden St. & Wayne St.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.
Station Construction: Orleans
• Where: Orleans Street (at Rocketts Landing)
• Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Shockoe Bottom East
• Where: East Main Street, eastbound between 24th and 25th Streets
• Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions. The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Sunday, April 30 to Saturday, May 6
Traffic Signals:
• When: Night work (6 p.m. to 6 a.m.) Sun., April 30 to Thurs., May 4
Day work (7 a.m. to 5 p.m.) Mon., May 1 to Fri., May 4
• Where: Broad St. at intersections from 4th St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.
Median MOT:
• Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station. At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.
Water Line Relocation: Willow Lawn
• Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
• Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave. parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Science Museum West and East s
• Where: Median of Broad St., between Robinson St. & Terminal Pl.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Cleveland East
• Where: Median of Broad St., between Tilden St. & Wayne St.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Orleans
• Where: Orleans Street (at Rocketts Landing)
• Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Shockoe Bottom East
• Where: East Main Street, eastbound between 24th and 25th Streets
• Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions. The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Sunday, May 7 to Saturday, May 13
Traffic Signals:
• When: Night work (6 p.m. to 6 a.m.) Sun., May 7 to Thurs., May 11
Day work (7 a.m. to 5 p.m.) Mon., May 8 to Fri., May 12
• Where: Broad St. at intersections from 5th St. eastward (trenching) and Broad St. from Thompson St. eastward (pulling signal conductor)
• Impacts: Temporary single and double lane closures laterally across Broad St. at signal intersections.
Noise: Depending on proximity to work zone, area residents could hear portions of trenching work. This includes equipment cutting across streets and intersections.
Median MOT:
• Impacts: Permanent closures of the median and inside lanes of Broad St., between Hamilton St. and 1st St. Two travel lanes remain open in both directions. Lane shifts are in effect at Allison, Science Museum and Cleveland stations. Parking has been removed in these locations, while construction is occurring, and will be restored to final configuration upon completion of each station.
At the Cleveland East station, left-turn access from Broad St. onto Cleveland St. and Altamont St. is temporarily closed, in both the eastbound and westbound directions, while construction of this station is occurring.
Water Line Relocation: Willow Lawn
• Where: Broad St. eastbound, between Byrd Ave. and Willow Lawn Dr.
• Impacts: Temporary closure of the curbside lane of Broad St., between Byrd Ave. and Willow Lawn Dr., heading eastbound
Station Construction: Allison East
• Where: Median of Broad St., between Allison St. & Meadow St.
• Impacts: Permanent closures of median and inside lanes of Broad St., in both the eastbound and westbound directions, at Allison East. Street parking impacts include the north side of Broad St (WB direction) between Strawberry St. and Allen Ave. parking will be permanently removed. South side of Broad St. (EB direction) between Strawberry St. and Allen Ave.: parking is temporarily removed, while the Allison East station construction is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Science Museum West and East
• Where: Median of Broad St., between Robinson St. & Terminal Pl.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Science Museum East. Street parking impacts include the north side of Broad St (WB direction) between Robinson St. and Terminal Pl. parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Robinson St. and east of the Boulevard: Parking will be removed while construction of Science Museum East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Cleveland East
• Where: Median of Broad St., between Tilden St. & Wayne St.
• Impacts: Permanent closures of median and inside lanes of Broad St., both eastbound and westbound, at Cleveland East. Street parking impacts include the north side of Broad St (WB direction) between N. Sheppard St. and Cleveland St. parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored. South side of Broad St. (EB direction) between Tilden St. and Wayne St.: Parking will be removed while construction of Cleveland East is occurring. After completion of station, parking will be restored.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Orleans
• Where: Orleans Street (at Rocketts Landing)
• Impacts: A portion of the roadway will be closed for construction operations, but travel lanes should remain open in both directions. Additionally the sidewalk within the construction zone will be closed during construction. Parking on Orleans Street will be temporarily removed during construction.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.
Station Construction: Shockoe Bottom East
• Where: East Main Street, eastbound between 24th and 25th Streets
• Impacts: Temporary closure of the eastbound right lane. Travel lanes should remain open in both directions.The sidewalk within the construction zone will be closed during construction. Parking will be temporarily removed in this location.
Noise: Depending on proximity to work zone, area residents could hear portions of work. This includes noise caused by equipment used to build the stations.