Friday, April 27, 2018

Pardon Our Dust UPDATE

Lane Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

Testing on the GRTC Pulse system began Mon., April 23. Motorists traveling the project route should be advised of changes in some traffic turn signals and permanent parking configurations. For updated information on parking, please access:


Work is continuing at Willow Lawn; Staples Mill East and West; Scott’s Addition East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; VCU Medical Center East and West; Main St. Station East and West; Shockoe Bottom East and West; East Riverfront East and West; and Rocketts Landing. Work includes landscaping and installing items such as cedar ceiling, totem signage, lighting, station glass and more. Meanwhile, roadway work and the integration of electrical components and communications are occurring.

While work is occurring, the public is advised to not enter station platform areas and to use designated crosswalks. Motorists, bikers and pedestrians are also advised to stay out of GRTC Pulse bus-only lanes and adhere to all posted signs.

Permitted hours are 7.a.m. to 5 p.m. Monday to Saturday, and 8 p.m. to 6 a.m. Sunday to Thursday.

Construction Activity:

Sunday, April 22 to Saturday, April 28 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Cedar ceiling / Station landscaping / Enclosure for beam lights

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Cedar ceiling / Station landscaping (both stations); Enclosure for beam lights (East station)

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Station landscaping (both stations); Cedar ceiling (West station)

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  No activity scheduled.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: No activity scheduled.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Install totem signage (West station)

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction: Install cameras / Totem sign (both stations)

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction: Install totem sign (West station)

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: Downspouts (both stations); Drill for station glass & glazing (West station)

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Downspouts (both stations); Drill for station glass & glazing (West station)

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations) 

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Set station glass & glazing (West station)

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Install cameras (both stations)

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  No activity scheduled.

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps and sidewalk repairs along Broad St.@ Boulevard, Robinson St., btwn Mulberry & Davis Sts., 9th St., 11th St., 12th St. / Sidewalk repairs along Main St. @ 15th St.

Sunday, April 29 to Saturday, May 5 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Totem lights / Beam lights

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Enclosure for beam lights / Beam lights (West station); Totem lights (Both stations)

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Cedar ceiling / Enclosure for beam lights / Beam lights / Totem lights (Both stations)

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping / Enclosure for beam lights / Totem lights (Both stations); Beam lights (East station)

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Cedar ceiling / Station landscaping / Totem lights (Both stations)

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Station landscaping (both stations) / Cedar ceiling (East station)

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Station landscaping (both stations); Drill station glass & glazing (East station)

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Station landscaping / Drill station glass & glazing (both stations); Install totem sign (East station)

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: Totem sign / Station landscaping (both stations); Install station glass & glazing (East station)

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Install totem sign (both stations)

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  No activity scheduled.

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  No activity scheduled.

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: No activity scheduled.

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  No activity scheduled 

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps and sidewalk repairs along Broad St.

Sunday, May 6 to Saturday, May 12 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  No activity scheduled

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  No activity scheduled

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  No activity scheduled

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Beam lights / Drill for station glass & glazing (West station)

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Enclosure for beam lights / Beam lights / Drill for station glass & glazing (both stations)

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Cedar ceiling / Enclosure for beam lights / Beam lights / Totem lights / Drill for station glass & glazing (both stations)

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Cedar ceiling / Totem lights / Enclosure for beam lights / Beam lights (both stations); Drill for station glass & glazing (West station)

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Enclosure for beam lights (East station); Cedar ceiling / Totem lights (both stations)

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: Totem lights / Cedar ceiling (both stations)

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Station landscaping / Totem lights (both stations); Cedar ceiling (East station)

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Station landscaping / Install totem sign / Install totem lights (both stations)

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Station landscaping / Install totem signs (both stations)

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Station landscaping (both stations); Install totem sign (East station)

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Station landscaping 

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps and sidewalk repairs along Broad St.

Friday, April 20, 2018

Pardon Our Dust UPDATE

Lane Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

Work is continuing at Willow Lawn; Staples Mill East and West; Scott’s Addition East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; VCU Medical Center East and West; Main St. Station East and West; Shockoe Bottom East and West; East Riverfront East and West; and Rocketts Landing. With much of the station construction complete, Lane continues to make final finishes at the stations:  downspouts, cedar ceiling installation, totem signage, lighting, station glass and more. Meanwhile, roadway work and the integration of electrical components and communications are occurring. Permitted daytime hours are 7.a.m. to 5 p.m., Monday to Saturday, and 8 p.m. to 6 a.m., Sunday to Thursday.

On Thurs., April 19 and Fri., April 20, Lane Construction removed orange barrels along the project route, used for MOT and for station construction. Removal enables GRTC to begin Operational Testing on the GRTC Pulse system beginning Mon., April 23. Motorists traveling the project route should be advised that changes in some traffic turn signals and permanent parking configurations are taking effect from now and into the following weeks. Please drive carefully, stay out of GRTC Pulse bus-only lanes and adhere to all posted signs, including new parking configurations. For updated information on dedicated bus lanes, parking, dedicated left-turn lanes and station locations, please access:

Broad Street: Willow Lawn to I95
Broad Street: I95 to Bowe Street
Broad Street: Bowe Street to 14th Street
14th Street and Main Street: 14th Street to Nicholson Street
Main Street: Nicholson Street to Orleans Street

Lower-resolution parking PDFs are also available here:


Construction Activity:

Sunday, April 15 to Saturday, April 21 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Downspouts / Cedar ceiling 

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Downspouts / Cedar ceiling (both stations)

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Install totem signs (both stations); Cedar ceiling (East station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Install totem signage (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Install cameras (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Drill for station glass & glazing (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Install cameras (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St. / Sidewalk repairs along Broad St.:  Tilden St., Sheppard St., Terminal Pl., Robinson St., Adams St., 2nd St., 5th St., 9th St., 11th St.

Sunday, April 22 to Saturday, April 28 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Station landscaping / Enclosure for beam lights / Totem lights / Beam lights

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Cedar ceiling / Station landscaping / Enclosure for beam lights / Totem lights / Beam lights (Both stations)

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping / Enclosure for beam lights / Beam lights / Downspouts / Totem lights (Both stations)

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping / Enclosure for beam lights / Beam lights / Downspouts / Install totem signage / Totem lights (Both stations)

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Cedar ceiling / Station landscaping / Enclosure for beam lights / Beam lights / Downspouts (Both stations)

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Enclosure for beam lights / Downspouts (Both stations); Beam lights / Cedar ceiling (East station)

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Install totem signage (both stations); Enclosure for beam lights (East station)

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction: No activity scheduled

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: No activity scheduled 

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Downspouts (both stations); Drill for station glass & glazing (East station) 

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations); Drill for station glass & glazing (West station)

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations); Set station glass & glazing (West station)

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Downspouts (both stations) 

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Downspouts 

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St. / Sidewalk repairs along Broad St.


Sunday, April 29 to Saturday, May 5 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  No activity scheduled

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  No activity scheduled

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  No activity scheduled

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  No activity scheduled

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Cedar ceiling / Totem lights (Both stations)

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping / Totem lights (both stations); Beam lights (West station)

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Beam lights / Downspouts / Station landscaping / Cedar ceiling / Totem lights (both stations); Enclosure for beam lights (West station)

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Install totem sign / Enclosure for beam lights / Beam lights / Station landscaping / Cedar ceiling / Totem lights (both stations); Drill for station glass & glazing (West station)

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: Install totem sign / Enclosure for beam lights / Beam lights / Station landscaping / Cedar ceiling / Drill for station glass & glazing (both stations)

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Enclosure for beam lights / Beam lights / Station landscaping (both stations); Drill for station glass & glazing (West station); Install totem sign (East station)

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Enclosure for beam lights / Beam lights / Station landscaping (both stations)

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Enclosure for beam lights / Station landscaping (both stations);  Beam lights (East station)

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Station landscaping (both stations); Enclosure for beam lights (East station)

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  No activity scheduled 

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St. / Sidewalk repairs along Broad St.

Friday, April 13, 2018

Pardon Our Dust UPDATE

Lane Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

Work is continuing at Willow Lawn; Staples Mill East and West; Scott’s Addition East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; VCU Medical Center East and West; Main St. Station East and West; Shockoe Bottom East and West; East Riverfront East and West; and Rocketts Landing. With much of the station construction complete, Lane continues to make final finishes at the stations:  downspouts, cedar ceiling installation, totem signage, lighting, station glass and more. Meanwhile, roadway work and the integration of electrical components and communications are occurring.

Motorists traveling the project route should be advised that changes in some traffic turn signals and permanent parking configurations are taking effect from now and into the following weeks. Please drive carefully and adhere to all posted signs.

Maintenance of Traffic (MOT) continues in areas along the project route; see last page of this look-ahead for messaging on the MOT, to be shared with stakeholders.

Work is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday, and permitted nighttime hours, 8 p.m. to 6 a.m., Sunday to Thursday.

Construction Activity:

Sunday, April 8 to Saturday, April 14 from 7 AM - 5 PM


Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Enclosure for beam lights / Downspouts / Beam lights 

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Downspouts (both stations); Totem signage

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)

Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction:  Totem signage (West station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Install cameras (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Est River Front West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Install cameras (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St.: Westmoreland St.; btwn Allison St. & Terminal Pl.; btwn 7th & 8th Sts.; btwn Cleveland & Altamont Sts. / Willow Lawn Dr. @ Markel Rd. / Sidewalk repairs along Broad St. at Altamont St., Davis St.

Sunday, April 15 to Saturday, April 21 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)

Station Construction:  Beam lights / Cedar ceiling

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Enclosure for beam lights / Beam lights / Cedar ceiling

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Enclosure for beam lights / Beam lights / Downspouts (both stations); Cedar ceiling (East station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Enclosure for beam lights / Beam lights / Downspouts (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Enclosure for beam lights / Beam lights / Downspouts (both stations); Totem signage (East station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Enclosure for beam lights / Downspouts (both stations); Totem signage (East station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Enclosure for beam lights / Downspouts (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Downspouts (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Downspouts 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St. / Sidewalk repairs along Broad St.

Sunday, April 22 to Saturday, April 28 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)

Station Construction:  Station landscaping

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Cedar ceiling / Station landscaping (Both stations)

Scott's Addition East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Cedar ceiling / Station landscaping (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Cedar ceiling (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Beam lights / Cedar ceiling (both stations); Totem signage (West station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Beam lights / Cedar ceiling (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction: Beam lights / Enclosure for Beam lights (both stations); Cedar ceiling (East station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction: Beam lights / Enclosure for Beam lights (both stations); Totem signage (East station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Medical Center East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Beam lights / Enclosure for Beam lights (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Beam lights / Enclosure for Beam lights (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Enclosure for beam lights (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Enclosure for beam lights (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Rocketts Landing:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Enclosure for beam lights 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St. / Sidewalk repairs along Broad St.

Friday, April 6, 2018

Pardon Our Dust UPDATE

Lane Construction continues work on GRTC Pulse, a new bus rapid transit system serving the Richmond Region, from Rocketts Landing to Willow Lawn.

This week on Broad Street, station construction continued at Willow Lawn; Staples Mill East and West; Cleveland East and West; Science Museum East and West; Allison East and West; VCU & VUU East and West; Arts District East and West; Convention Center East and West; Government Center East and West; and VCU Hospital East and West. On E. Main Street, construction continued at Main St. Station East and West; Shockoe Bottom East and West; East Riverfront East and West; and Orleans. In addition, roadway work and integration of electrical components and communications are occurring.

Maintenance of Traffic (MOT) has been established in areas along the project route; see last page of this look-ahead for messaging on the MOT, to be shared with stakeholders.

Construction activity is occurring during permitted daytime hours, 7.a.m. to 5 p.m., Monday to Saturday, and permitted nighttime hours, 8 p.m. to 6 a.m., Sunday to Thursday.

Construction Activity:

Sunday, April 1 to Saturday, April 7 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Install cameras / Downspouts / Beam lights
Roadway Work:  Construct pedestrian curb ramps 

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Totem signage / Downspouts (both stations)

Cleveland East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Roadway Work:  Construct handicap ramps @ Hermitage Rd.
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Plywood for cedar ceiling / Install cameras (both stations) 
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction:   Plywood for cedar ceiling / Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Hospital East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Plywood for cedar ceiling / Install handrails (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Plywood for cedar ceiling / Bricks sidewalk tie-ins / Install handrails  (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Plywood for Cedar ceiling (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction:  Install cameras (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Orleans:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction: Install cameras 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work: Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St.; left lane closures btwn 7th & 8th Sts.; right lane closures btwn 4th & 14th Sts.

Sunday, April 8 to Saturday, April 14 from 7 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)
Station Construction:  Enclosure for beam lights / Cedar ceiling

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Enclosure for beam lights / Beam lights / Cedar ceiling (Both stations)

Cleveland East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Enclosure for beam lights / Beam lights / Downspouts / Cedar ceiling (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Enclosure for beam lights / Beam lights / Downspouts (both stations) 
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction:  Totem signage / Enclosure for beam lights / Beam lights / Downspouts (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Beam lights / Downspouts (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Beam lights / Downspouts (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Hospital East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Downspouts (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Downspouts (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Orleans:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Downspouts 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St.  

Sunday, April 15 to Saturday, April 21 from 14 AM - 5 PM

Willow Lawn: Broad St., between Byrd Ave & Willow Lawn Dr. (Curbside Station; Western Terminus)

Staples Mill East / West: Broad St., between Staples Mill Rd. & Blacker St.  (Curbside Station)
Station Construction:  Cedar ceiling (Both stations)

Cleveland East / West: Broad St. between Cleveland St. & Altamont St.  (Median Station)
Station Construction:  Cedar ceiling (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Science Museum East / West: Broad St. between Robinson St. & Terminal Pl.  (Median Station)
Station Construction:  Cedar ceiling (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Allison East / West: Broad St., between Meadow & Strawberry Sts.    (Median Station)
Station Construction: Cedar ceiling (Both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

VCU & VUU East / West: Broad St., between Shafer & Laurel Sts.  (Median Station)
Station Construction:  Enclosure for Beam lights / Cedar ceiling / Totem signage (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Arts District East / West: Broad St., between Foushee & Jefferson Sts.  (Median Station)
Station Construction:  Enclosure for Beam lights / Cedar ceiling (both stations)
Parking Impacts: No Parking in these locations during construction; parking will be restored to final configuration upon completion of each station.

Convention Center East / West:  Broad St., between 2nd & 5th Sts. (Curbside Station)
Station Construction:  Beam lights / Enclosure for Beam lights / Cedar ceiling (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Government Center East / West: Broad St., between 8th & 10th Sts. (Curbside Station)
Station Construction:  Beam lights / Enclosure for Beam lights / Cedar ceiling (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

VCU Hospital East / West: Broad St., between 11th & Old 14th Sts. (Curbside Station)
Station Construction: Beam lights / Enclosure for Beam lights (both stations) 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Main St. Station East / West:  E. Main St., between 15th & 17th Sts. (Curbside Station)
Station Construction:  Beam lights / Enclosure for Beam lights (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Shockoe Bottom East / West:  E. Main St., between 24th & 25th Sts. (Curbside Station)
Station Construction:  Beam lights (both stations) / Station glass & Glazing (West station)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

East Riverfront West / East: E. Main St., between Ash St. & Nicholson St. (Curbside Station)
Station Construction: Beam lights (both stations)
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Orleans:  Orleans St. at Rocketts Landing (Curbside Station; Eastern Terminus)
Station Construction:  Beam lights 
Parking Impacts: Parking is temporarily removed, where station construction is occurring

Other Location Impacts:
Roadway Work:  Construct pedestrian curb ramps (GC-12’s) at several median intersections along Broad St.